Furnace

Case study n°1

Duration of the cleaning: 4 days.

BEFORE CLEANING AFTER CLEANING DELTA
Feed 821 m3/hour 871 m3/hour +50 m3/hour (+6.1%)
Radiation Cell temperature 866°C 736°C -130°C
Convection Cell temperature 357°C 308°C -49°C

Source: Furnace T2F****

curves

curves

curves

Furnace

Case study n°2

Duration of the cleaning: 4 days.

BEFORE CLEANING AFTER CLEANING DELTA
Radiation Cell1 temperature 847°C 667°C -180°C
Radiation Cell2 temperature 842°C 648°C -194°C
Convection Cell3 temperature 850°C 639°C -211°C

Source: Furnace 40*A, 3 Radiations cells

Ethylen Furnace

Case study n°3

ENG. UNITS BEFORE CLEANING AFTER CLEANING
Feed (naphta) kg/hr 9 071 9 403
COT °C 825 825
Fuel gas flow kg.hr 1 500 1 426
Fuel gas pressure bar g 1.60 1.33
O2 vol % 2.62 2.54
Excess air % 1.142 1.138
Draft mmH2O 3.45 3.31
Fan speed rpm 1 550 1 400
Damper O.P. % 106.9 100.0
Stack temperature °C 254 205
Ambient temperature °C 20 20

Fuel gas net heating value : 12 200 kcal/kg.
Combustion air required : 17.38 kg/kg fuel.